job sequence 基本解释
网络 加工程序; 加工程序加工指令序列; 指令序列; 加工序列
重点词汇
- jobn. 工作, 零活, 职业, 事情 vi. 做零工, 打杂, 做股票经纪, 假公济私 vt. 代客买卖, 批发, 承包, 欺骗 [计] 作业
- sequencen. 序列, 续发事件, 顺序, 连续 vt. 按顺序排好 [计] 顺序
job sequence 双语例句
- 1、
WebSphere DataStage's job sequencer is a graphical tool that allows developers to specify a sequence of jobs to run, along with exception handling with looping and flow control.
WebSphereDataStage的作业定序器是一种图形化工具,程序员可以通过它来指定要运行的一系列作业,以及带循环和流控制的异常处理。 - 2、
It includes job name, job execution times, number of rows processed, error or success status, time started, and time completed, which are all described in sequence.
它包括作业名称、作业执行次数、处理的行数、错误或成功状态、开始时间及完成时间,这些都是按顺序描述的。 - 3、
Sequences can contain control information that indicate different actions depending on whether a job in the sequence succeeds or fails.
根据序列中的作业成功还是失败,序列可以包含表示不同动作的控制信息。 - 4、
job sequence perturbation analysis algorithm for Job Shop scheduling problem
Jobshop的工件序摄动分析算法 - 5、
The method of due-date determination and job sequence optimization for single-machine scheduling
单台机器调度的交货期确定及任务排序的优化方法 - 6、
In second phase, assign the sorted job to the latest free machine according the sequence obtained in first phase.
然后将工件按第一阶段所求得的次序指派到最先空闲的并行的机器上; - 7、
According to the characteristic of flexible job shop scheduling, the code method based on operation sequence, machine assignment and corresponding crossover, mutation is designed.
此算法针对解决柔性工作车间调度问题采用工序顺序偏码的局限性,设计了基于顺序和基于机器分配的编码方法并据此给出了相应的交叉变异操作。 - 8、
Heuristic algorithm of job-shop scheduling problem with sequence-dependence between jobs
有优先顺序约束的单件车间调度问题的一种启发式算法 - 9、
In the job-sequencing phase, a rule coding based genetic algorithm was adopted to optimize the job sequence in each cluster.
在工件排序阶段,采用基于规则编码的遗传算法,优化各聚类内工件的加工顺序。 - 10、
The job planning in a manufacturing workshop is to fix on the machining sequence, the starting time and finishing time for each part.
制造车间作业计划就是确定工件的加工顺序,确定机器加工每个工件的开始时间和完成时间。 - 11、
It is convenient to view a job as a sequence of k tasks-one task for each stage, where the processing of any task can commence only after the completion of the preceding task.
我们可以把一个工件看成一个具有k个任务的序列,每个任务针对一个阶段,且任何任务必须在其前序任务处理完成之后才能够被处理。 - 12、
The objective is to determine job delivery scheduling, batches processing sequence and path selection so as to minimize the maximum completion time.
要求确定工件的分批同时确定工件的批间、批内加工顺序和运输路径选择,目标是最小化最大完工时间。 - 13、
Job Shop scheduling problem ( JSSP) is a class of combinatorial optimum problems with time, sequence and resource constraints.
车间作业调度问题(Jobshopschedulingproblem,JSSP)是一类具有时间约束、次序约束和资源约束的组合优化问题。 - 14、
For Job-Shop scheduling problem character, in this paper we use the encoding method based on job number sequence and try to dynamically integrate the two algorithms to solve the Job-Shop scheduling problem.
针对Job-Shop调度问题的特点,本文采用了基于工件号排序的编码方式,并尝试将两个算法相互动态融合来求解Job-Shop调度问题。 - 15、
It is a job execution sequence by correlative jobs organized according to the dependency of these jobs. And it is a good solving project to achieve the automatization of job execution flow.
作业流是对作业概念的扩展,是将相互关联的作业按照一定的依赖关系组织而成的一个作业执行序列,是实现作业执行流程自动化的一种很好的解决方案。 - 16、
Extensive simulation results show that when the breakdown occurred on the two-thirds of job sequence, predictable schedules can provide high predictability with minor sacrificed efficiency performance.
仿真实验表明,当机器故障发生在工件加工序列前三分之二位置时,三种预测调度虽然牺牲了部分性能指标,但是对机器故障都具有很好的预测性。 - 17、
The objective is to determine the job processing sequence in the plant, the delivery schedule and the batching so as to minimize the sum of job flow times.
确定工件加工顺序以及运输分批,使总流程时间最短。 - 18、
Meanwhile, job shop scheduling problem ( JSP) is a kind of resource allocating problem satisfying task configuration and sequence restriction.
其中作业车间调度问题是一类满足任务配置和顺序约束要求的资源分配问题,是最困难的组合优化问题之一。

