arrow diagram 基本解释
矢量图;箭头图
重点词汇
arrow diagram 双语例句
- 1、
For specifying the binding parameters, select the binding arrow in the main diagram and then select the Properties> General tab.
为了指定绑定的参数,您可以在主图表中选择绑定的箭头,然后选择Properties>General项。 - 2、
Click and drag the incoming arrow from the element to an empty diagram location.
点击引入的箭头,从元素拖拽到一个空图位置。 - 3、
The double-lined arrow in the diagram is an alternative notation that shows a unit being hosted on another unit.
图表中的双行箭头是一种提示:寄主于另一个单元上的单元。 - 4、
Sooner or later, every single box and arrow on your architecture diagram will go wonky.
你的架构图上的每个框图或者箭头总有靠不住的时候,这是确定无疑的。 - 5、
Drag onto the page to add a cause arrow to attach to effects in a cause-and-effect diagram.
拖到绘图页后,可以在因果图中添加原因箭头,并连接到效果。 - 6、
In this paper the mathematical model for the problems of working out an arrow network planning and drawing its diagram by computer is constructed.
目前,用计算机编制网络计划和绘制网络图仍需不少人工参与。 - 7、
The paper introduces the programming and methods of arrow diagram, combined with the application in engineering construction and optimization method in programming, it can be used in the construction.
文章介绍了网络图的编制程序和方法,结合在工程施工中的应用,以及在编制过程中的优化方法,以便在工程中实际应用。 - 8、
A flow chart can be transformed into an arrow diagram by adding dummy activities, but it is not an optimal one, because there are many abandoned dummy activities in it.
指出,通过添加虚箭线的方法可使流程图转变成箭线网络图,但它含有许多多余的虚箭线,因而不是最优箭线图。 - 9、
Based on the theory of Fractal, both the accuracy of AutoCAD drawing and the flexibility of Visual-Lisp are utilized to construct Pythagoras Tree's basic model and multilevel tree shape, then it can be realized to immediately zoom and get arrow diagram.
以分形学理论为基础,应用AutoCAD绘图的精确性及其内部语言VISUALLISP的灵活性,共同打造PythagorasTree的基础模型及多层次树形,实现实时缩放和图形矢量化。 - 10、
The Rules of Node Numbering in Designing an arrow diagram and Its Algorithm Used for Computers
网络图结点编号拓扑排序规则及其计算机算法 - 11、
Floats Relationship Model in Arrow Network Diagram
箭线网络图的时差关系图式 - 12、
Although this problem is solved by using a TGS based directed arrow diagram, the research of this problem using a Petri net is new method and more direct.
虽然已经有人利用有向图的TGS模型解决过这一问题,但是利用Petri网技术研究该问题是一种新方法,而且更加直观。 - 13、
This paper presents an algorithm for numbering nodes of arrow diagram and adding dummy jobs ( dummy activities) in planning and scheduling networks.
本文介绍一种算法,可对工程管理网络图的各个结点进行编号,并实现虚工序的自动添加。 - 14、
The Judgement and Uniqueness of Optimal arrow diagram
最优箭线图的判定与唯一性 - 15、
In this paper, we propose a programmed method to draw an optimal AOA ( activity on arrow) network diagram according to the schedule of ordinary precedence activities and give an example to illustrate the application of this method. Multithreading Process
提出了一种根据普通紧前工序表绘制最优箭线式网络图的程序化方法,并例举了一个应用该方法绘制最优箭线式网络图的实例

